Old 41 Widening – Phase I & II

Phase I of the project consisted of improving dirt roads to two-lane urban sections with curb and gutter and new construction of Cockleshell Drive. The improvements allowed the installation of a four-way traffic signal at Old 41 Road and Shangri-La Road. The total length of work along the four roads was approximately 1.1 miles.

old41-1

old41-2

Phase II of the project involved widening 2.75 miles an existing two-lane rural section to a four-lane divided highway from Rosemary Drive to U.S. 41. The plans also included the addition of sidewalks, water, sewer and reclaimed water relocations and the use of gravity walls.

old41-3