Santa Barbara Boulevard Expansion

ABB was hired for the development of construction plans for proposed improvements for Santa Barbara Boulevard from Davis Boulevard to Rattlesnake Hammock Road. The project involved widening and new construction of an existing two-lane, non-divided rural section to a six-lane divided roadway. The design of the plans also included the addition of sidewalks, the relocation of a watermain, a reclaimed watermain and two force mains.